# About Us

> Summit Retaining Walls Cairns builds retaining walls from Cooktown down to Tully and on the Tablelands.

Title: About Us | Summit Retaining Walls Cairns
Canonical: https://summitretainingwallscairns.com.au/about/
Site: Summit Retaining Walls Cairns

We're a Port Douglas crew, and we've spent over 40 years building retaining walls on the steep, wet blocks of Far North Queensland. We do our own digging with our own machines, and when a wall needs an engineer and council approval, we organise it for you.

## Our Services

We build four kinds of retaining wall: timber sleeper, concrete sleeper, block and gabion.

Got an old wall that's rotted, cracked or leaning? We take it out first and put the new one where it stood.

## Why Choose Us

We put drainage in behind every wall, and we look after the engineering and council side when a wall needs it.

- **Over 40 years building walls**: We've been building retaining walls for over 40 years, on all sorts of slopes and soils. When we come out to yours, we'll tell you which wall suits it.
- **Our own excavators**: They cut back the bank and move the soil, and they lift out the old wall when one needs replacing. Because they belong to us, there's no hire machine to book before we start.
- **Engineering and council sorted**: Taller walls, and walls close to a house, a boundary or another wall, usually need an engineer's design and building approval. We spot that at the site visit and look after both before any digging starts.
- **Drainage behind the wall**: Water trapped behind a wall is what usually pushes it over. We pack gravel in behind ours with ag pipe, a slotted pipe that carries the water off. On bigger jobs a plumber does that part.

## Where We Work

We're based in Port Douglas. We work south through Cairns to Tully, north to Cooktown and up onto the Atherton Tablelands.

Site visits are free. If you're a long drive from us, photos are often enough for a quote. On a small job that far out, you'd cover our travel.

## How It Works

- **Free site visit**: You fill in the form and we ring to book a time. Then we're out on your block looking at the slope, the soil and the way in for the excavator.
- **Written quote**: The price comes down to the wall type, its height and length, and how easy it is to get a machine in. You'll get it in a written quote after the site visit.
- **We build the wall**: If the wall needs an engineer and council approval, we get that sorted first. Then we dig out the bank and build the wall with the drainage behind it.
