# Frequently Asked Questions

> Find out what a retaining wall costs, when it needs council approval and how drainage works in Cairns.

Title: Retaining Wall FAQs | Summit Retaining Walls Cairns
Canonical: https://summitretainingwallscairns.com.au/faqs/
Site: Summit Retaining Walls Cairns

Most people ask us the same few things before they book: what a retaining wall costs in Cairns, whether it needs council approval, which wall suits their slope and how it copes with the wet season. Timber walls start from $320 per square metre, and the rest depends on your block.

## Getting a quote

### How much does a retaining wall cost?

Prices start from $320 per square metre of wall face for timber sleepers, $430 for concrete sleepers and $650 for concrete block. Wall face means the height times the length, and gabion walls are priced at the site visit. The height, machine access and any engineer's design set your exact price, which we give you in a written quote after the free site visit. For a quick figure first, try our [retaining wall cost calculator](https://summitretainingwallscairns.com.au/retaining-wall-cost-calculator/).

### Do you charge for the site visit?

No, it's free. We'll look over the slope and see where the water runs off. Then we work out how to get the excavator in and send the quote through in writing.

### Do you work outside Cairns?

Yes. We're based in Port Douglas and go as far north as Cooktown, south to Tully and up onto the Atherton Tablelands. For jobs a long way out we can often price from photos first, and on a small one you'd pay our travel.

## Council and engineering

### Do I need council approval for a retaining wall in QLD?

A taller wall, or one close to a house, a boundary or another wall, usually needs an engineer's design and building approval. The design is drawings of how the wall holds the soil, and the approval is the official go-ahead. We check at the site visit, and if yours needs them, we get both sorted before work starts.

### Who sorts out the engineering and council side?

We do, whenever your wall needs it. We line up the engineer for the design and look after the council approval, and you won't have to chase either of them.

## Walls and materials

### Is timber or concrete better for a retaining wall?

Timber costs less up front. We use treated pine, soaked in preservative to slow rot and termites, but it can still rot in the ground over time. Concrete sleepers cost more and don't rot at all, which makes them the safer pick for a damp spot.

### Which wall type suits my block?

That depends on how high the wall is, how wet that part of the block gets and how we'll get a machine in. Put what you know in the form, like what the wall's holding back, and we'll narrow it down from there. Once we've seen the slope, we'll help you pick between timber sleeper, concrete sleeper, block and gabion.

### What is a gabion wall?

It's a wall made from wire baskets, called gabions, packed with rock and stacked on top of each other. Water runs straight through the gaps in the rock, which is handy on a block that gets soaked every wet season.

## Drainage and the wet season

### Does a retaining wall need drainage behind it?

Yes, because water that can't get away builds up behind the wall and pushes. That's how plenty of walls end up leaning after a big wet. The usual fix is ag pipe, a slotted pipe that carries water away, laid in gravel so the water can find its way in.

### Who puts the drainage in?

Our crew does, as part of building the wall. On the bigger jobs we get a plumber in for that part.

## Old walls

### Can you remove my old retaining wall?

Yes. We lift the old posts and sleepers, or the blocks, out with the excavator and build the new wall in the same spot. It's usually water with nowhere to go that finished the old one off, so the new wall gets proper drainage behind it.

### How do I know if my wall needs replacing?

Stand back and look at it side on: if it leans forward or bulges in the middle, it's in trouble. Rotten or cracked sleepers and soil washing out through the gaps are bad signs too. If you're not sure, put what you can see in the form and we'll check it when we come out.